For Builders & Plumbers
ATTENTION: EFFECTIVE 02.10.21 – – RESIDENTIAL INSPECTIONS HAVE A NEW EMAIL AND PHONE NUMBER TO CALL IN :
INSPECTIONS@WCID 17 / 512 823-2163
REMINDER: After receipt of application and payment, Plan Reviews may take up to four (4) weeks and Permits may take up to (3) three weeks to issue.
Plumbing
- Plumbing Code Adopted with Local Amendments – October 20, 2016 – A copy of the 2015 UPC is available to review at the District office
- Plumbing Inspections
- Detailed Inspection Requirements
- Permits / Inspection Fees
- Plumbing Permits FAQ
- Plumbing Permit Application, Residential – Form
- Pool Permit Application
- Cross-Connection and Backflow Prevention
- Pressure Regulating Valve (PRV) Requirements
- Tankless Hot Water Heater Installation
- Grinder Pump System Installation & Startup – 2019
- Grinder Pump Start-up Checklist
- Backflow Device Test Form
- Qualified Grinder System Plumbers
- Qualified Backflow Device Testers
Requirements for Service
- Service Agreement – Form
- Service Applications by Subdivision – Form
- Temporary Fire Hydrant / Bulk Water Serv. Agmt.
- Meter Requirements
New Building/Infrastructure Construction
TEMPORARY COMMERCIAL PLAN REVIEW PROCESS – 1023.2020
- Plan Reviews and Fees
- WCID 17 Plan Review Submittal Requirements
- Application for Residential Plan Review – Form
- Application for Commercial/Subdivision Plan Review – Form
- Construction Inspections
- 6.0 Construction Standards (Updated May 2019)
- Construction Notes (Updated August 2019)
- Fire Flow Testing
- Fire Hydrant Meters
- Septic Tank Information
- Small Project Procedures
- Construction & Development Review & Approval Procedures
- Preconstruction Conference Checklist
Standard Detail Drawings (Master List)
- Wastewater Details (pdf) Revised WW-28 thru WW31 July 2016
- Water Details (pdf) Revised March 2017, Addition of W-12: Fire Riser
- Water/Wastewater Details (pdf) Revised 2016
- Commercial Grinder Stations (pdf) Added 2016-10
- Lift Station Typical Drawings (pdf) Revised 2020
- Lift Station Electrical / Specifications (pdf) Revised 2019
- Lift Station Electrical / Drawings (pdf) Revised 2019
- RPZ Installation Detail (pdf)
Landscape Irrigation
-
-
- Landscape Irrigation Policy(pdf) Revised 2019-0516
-
- Landscape Irrigation System Requirements (summary) (pdf) Revised May 2019
- Irrigation Permit Application
- Irrigation Easement Form
- Irrigation Plan Review Checklist
- Irrigation Inspection Checklist
- Annual Water Budget
- Certificate of Delivery
- Irrigation Audit Request
- Serene Hills Landscape Requirements
- Backflow Prevention Device Requirements
-
- Travis County WCID No. 17
- 3812 Eck Lane, Austin, TX 78734
- 512-266-1111
- Site Map