Water Details
Signed copies of the Water Appurtenances are available below. Please review the content and click on the sheet number to download the desired details.
- Sheet 1 of 5
- Trench with Paved Surface
- Encasement Detail with Casing Spacers
- Trench with Unfinished Surface
- Pavement Markers
- Utility Crossings
- Dual PRV Installation
- Concrete Encasement
- Concrete Trench Cap
- Sheet 2 of 5
- Minimum Excavation Clearance for Installation of Pressure Tap
- Vertical Down Bend
- Concrete Thrust Blocking
- Marker Details
- Release Valve Installation (Type II)
- Standard Fire Hydrant Assembly Information
- Sheet 3 of 5
- Butterfly Valve with Box Assembly
- Vertical Gate with Box Assembly
- Valve Box Casting Boot
- Valve Box Casting Collar
- Valve Box Casting Lid
- Valve Box Adjustment to Grade with Full Depth Concrete
- Valve Box Adjustment to Grade with Concrete and H.M.A.C.
- Sheet 4 of 5
- 1 inch or 2 inch Meter Installation Showing Optional Bypass
- 5/8 inch or 1 inch Single Meter Installation
- Two 1 inch Meter Installation
- Sheet 5 of 5
- Valve Box Adjustment
- Blow-off Hydrant
- Compound Meters