tank tank
WCID 17
tank

Fire Hydrant Meters

Fire hydrant meters may be set up for temporary construction water. Apply for a construction meter at the District office at 3812 Eck Lane.

A 5/8-inch construction meter requires a $75.00 deposit which is refundable on the final bill. A 2-inch construction meter requires a $600.00 deposit which is refundable on the final bill. There is also a $100.00 meter set fee. District staff will set the meter. However, the contractor is expected to provide a properly operating backflow prevention device.

There will be a $50.00 charge each time the meter location is moved during the construction process.